DRIVE-THRU / CURBSIDE PICKUP

Passwords are now required to access your account. To create a password, select "Reset my Password" from the Login screen (email address required). For further assistance, please visit the Library Account Passwords FAQ page for instructions or call the library at 970-243-4442.


Showing 1 - 7 of 7 , query time: 4.07s
Cover Image
Format:
Image
The Belden mill and tram in Eagle Canyon, below Gilman. Railroad tracks at bottom right in photo. Taken after the 1919 landslide.
Cover Image
Format:
Image
Looking south along the railroad tracks at Belden towards the Belden mill. Destroyed cribbing on the left and debris on the tracks in the background.
Cover Image
Format:
Image
Documenting the landslide onto the D&RG tracks in Eagle River Canyon. The numbers on the photo correspond to the descriptions below. "1. Loading tipple; 2. Service tunnel to mill stope. Note how completely the slide buried it" [written by Tom Knight]
Cover Image
Format:
Image
Documenting the landslide onto the D&RG tracks in Eagle River Canyon. The numbers on the photo correspond to the descriptions below. The old mill is at far right. Verso: "1. New House Station on tram; 2. Eagle River; 3. Slide on D&RG; 4. An old mill, note the cribbing underneath the building" [written by Tom Knight]
Cover Image
Format:
Image
Documenting the landslide onto the D&RG tracks in Eagle River Canyon. The numbers on the photo correspond to the descriptions below. Verso: "1. Compressor house; 2. Tram landing; 3. New House tunnel station on tram; I am working on a level with the New House Tunnel, but about ½ miles in the Mtn. Notice how steep the tram is; it's steeper yet before it reaches Gilman." [written by Tom Knight]
Cover Image
Format:
Image
An ore car at right, going out to the main pit (Grizzly). Once it arrives at the pit, the rocker wheel on the cart is elevated by the track and dumps the contents of the cart into the pit.
Cover Image
Format:
Image
The rod and ball mill. The rod mill is on the left and ball mill on the right. These were used to grind the zinc concentrates for additional chemical processing. Prior to this, the material had chemical agents added to allow the zinc mineral surface to adhere to flotation bubbles. These were some of the steps for making the zinc ready to ship in railroad cars.