DRIVE-THRU / CURBSIDE PICKUP

Passwords are now required to access your account. To create a password, select "Reset my Password" from the Login screen (email address required). For further assistance, please visit the Library Account Passwords FAQ page for instructions or call the library at 970-243-4442.


Showing 421 - 429 of 429 , query time: 0.01s
Cover Image
Format:
Image
Excavation of additional cut-off trench looking toward right abutment from axis sta. 16+50. Right side of cut is in primary cut-off trench placed in 1938. Shovel is working in original foundation material. Refer to Pine R - 182.
Cover Image
Format:
Image
Excavation for additional cut-off trench, looking toward right abutment from axis station 16+75. Excavation is complete and bottom of trench is a minimum of 6 ft. into glacial till. Refer to Pine R - 188.
Cover Image
Format:
Image
Placing embankment in additional cut-off trench. Looking toward right abutment from axis station 15+75.
Cover Image
Format:
Image
End of completed additional cut-off trench at axis station 19+50, taken from station 18+25. Refer to Pine R - 190.
Cover Image
Format:
Image
Downstream side of additional cut-off trench showing sand pocket. Taken from axis at station 15+75.
Cover Image
Format:
Image
Excavation for additional cut-off trench, looking toward left abutment from axis sta. 14+90. Excavation is practically complete. Junction with secondary cut-off is at rear end of shovel. Refer to Pine R - 183.
Cover Image
Format:
Image
Looking downstream in inlet channel to outlet works from outlet works station 4+50, note 3 to 1 slope directly behind trashrack which will be riprapped.
Cover Image
Format:
Image
Looking downstream in outlet conduit from sta. 6+75. showing placing of compacted embankment over conduit. Refer to Pine R - 134.
Cover Image
Format:
Image
Placing forms and reinforcement for gate chamber and addition to spiral stairway shaft.