DRIVE-THRU / CURBSIDE PICKUP

Passwords are now required to access your account. To create a password, select "Reset my Password" from the Login screen (email address required). For further assistance, please visit the Library Account Passwords FAQ page for instructions or call the library at 970-243-4442.


Showing 1 - 20 of 55 , query time: 0.01s
Cover Image
Format:
Image
The Center has two identical photoprints of this image, each on its original cardboard card.
Cover Image
Format:
Image
A number of persons are standing outside a small clapboard pitched-roof building.
Cover Image
Format:
Image
Six men are standing between the huge generator and a pulley.
Cover Image
Format:
Image
Six men are seated near the generator, looking at the photographer.
Cover Image
Format:
Image
Two men are standing behind the generator.
Cover Image
Format:
Image
Several buildings below train tracks on a hillside above.
Cover Image
Format:
Image
A close view of the wooden structure of the early Ames station, in winter. 2 identical original matted prints.
Cover Image
Format:
Image
A team of two horses is standing in harness at the lower left corner of this photo. Logs and timber have been cut and are being positioned for the dam construction.
Cover Image
Format:
Image
Disconnected section of smokestack being suspended by cables.
Cover Image
Format:
Image
Large pipe in front of brick building.
Cover Image
Format:
Image
Two-story brick building with metal roof and smokestack.
Cover Image
Format:
Image
Flat bed truck carrying 2 large transformers in front of building.
Cover Image
Format:
Image
A black and white photograph of the side of a mountain with what appears to be water coming down the side.
Cover Image
Format:
Image
A black and white photo of a generator.
Cover Image
Format:
Image
Crew men are at work on the flume, near Telluride. The flume is built of wood and metal. This image is dated after July 15, 1923.
Cover Image
Format:
Image
Crew men are in a long line at work on the flume along a steep hillside, near Telluride, some time between July 25 and August 1 of 1923. The flume is built of wood and metal.
Cover Image
Format:
Image
Two men are unloading supplies from a wagon drawn by two horses.
Cover Image
Format:
Image
Two cross section blueprint drawings beneath the photo on the photo card were not included in the digital scan.
Cover Image
Format:
Image
A cross section blueprint drawing beneath the photo on the photo card was not included in the digital scan. See also Photoprints VIII-05-30 and VIII-05-40 for similar views on the same date.
Cover Image
Format:
Image
A black and white photograph of a building at the base of a mountain. It appears to be winter because there is snow covering the ground.